Image_Case Study_Honington Primary School_4

Honington Primary School

Speed was the primary driver to deliver a new teaching facility for the start of term.

The Project

Speed was the primary driver to deliver a new teaching facility for the start of term. Kingspan TEK was able to hit the air tightness performance that had challenged similar traditionally built projects.

Client:
Suffolk County Council
Contractor:
Cocksedge Building Contractors
Build System:
Kingspan TEK

The Challenge

Honington Primary School was part of Suffolk County Councils classroom
extension programme that was rolled out across the county to provide additional
teaching space for expanding primary schools.

The structure was completed during term time so again noise and pollution had
to be kept to a minimum but the main driver behind using Kingspan TEK was the
speed of build and fabric performance.

It was vital that the classroom was constructed to programme as a new influx of students were enrolling at the start of the new term.
 
  • Highlights: Achieving build programme & Air Tightness
  • Challenges: Working in small area with the school still active
  • How challenges were resolved: Using the off-site manufacturing process along with the Kingspan TEK panel enabled KTS to achieve programme & performance
Download
Image_Case Study_Honington Primary School_2
Previous
Next

Our Build Systems

Timber Frame and Brochure of Kinspan Timber Solutions timber Frame and Structural insulated panels brochure

Kingspan Timber Solutions Product Selector

Self building is one of the most exciting events in a lifetime, but it requires lots of decisions. What's within the walls is just as important as how they look on the outside.

Arial view on a pine wood

Give us a call on 01767 676400

or Send us your drawings

Get in touch


Kingspan Timber Solutions

Kingspan Timber Solutions

Eltisley Road

Great Gransden

Sandy

SG19 3AR

01767 676400